|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ISUN is
manufacturing the mould process in house, our equipments are working uninterruptedly
24 hours a day.
We are capable of manufacturing precise moulds with various dimensions and
the complex moulds, also can
accept large orders.
The flow line managing method is adopted by ISUN mold for mold making. Every
step is the customer of the
previous step. Self-inspection in every single step is required before going
to the next step to ensure the quality. |
|
|
|
|
Our strength: |
|
|
|
|
|
- High precision mold(tolerance¡À0.005mm);
- The biggest
mould we can build: 1500MMX 2000MM;
- .Multi-color /Multi-material
;
- High cavitations hot runner
mould with interchangeability;
- Unscrewing mould;
- Thin wall and closure mould;
- Insert mould;
- mold with special plastic material;
- Die-casting mould;
- Prototype;
- Painting/printing and coating
service,
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Standard:
|
|
|
|
|
|
- All molds are constructed according
to clients¡¯s requirement;
- DME, HASCO, LKM, RABOURDIN,
FUTABA;
- Conformance SPI/SPE classes
(101,102¡ ) or above;
- Conformance European standard
are available;
- High productivity mold standard
according to Isun Standard are available;
- Production mold standards, prototype
tools standard for testing purpose are available;
- We build
hot runner molds and are familiar with many different systems such as
DME, Mold master, Mastip, Hasco,Yudo, Incoe, Husky etc, The manifold
recommended for you tool is selected to meet you individual needs;
|
|
|
|
|
|
|
|
|
|
|
Mould raw material
and plastics material commonly used by us:
|
|
|
|
|
- Steel material£º420/1.2083/H13/1.2344
/1.2767/S136/S7/P20/1. 2311/NAK80/SKD61/8407¡.;
- Plastic material£ºABS, ABS/PC,
PPO(Noryl) ,Polyamide(Nylon), TPE(Rubber); Polypropylene(PP),Polystyrene(PS),
Acetal, (Noryl), Polycarbonate(PC), PVC, Glass Filled Materials (Nylon,
etc.) ;
- Special plastic material:
PSU, PEEK, PPS, PES, Ultem(with Glass Filler), ABS or Nylon(with Carbon
Filler) etc;
|
|
|
|
Other requirements:
|
|
|
|
|
|
|
|
|
- Use Copper alloy and/or
Beryllium copper to optimize the cooling performance at the critical
area;
- Electroless nickel plating
on moldbase upon request;
|
|
|
|
Lead-time:
|
|
|
|
|
|
|
|
|
- Base on mold complexity
and production status, 2-4 weeks for prototype molds and 4-8 weeks for
production molds;
- Base on mold modification
complexity status,2-7 work days;
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CCopyright
© 2002-2021 ISUN MOULD INDUSTRIAL CO., LTD.
All Rights Reserved
|
|